石家庄前车之鉴说明,钢波纹管这样安装是错误的

浏览:12502 发布日期:2021-07-05

为确保钢波纹管的间距和顺直,可用钢筋支架对波纹管进行点焊固定,防止浇筑砼时左右位移。管道铺设后,出于其它原因形成管壁呈现局部损坏,当损坏程度比较小时,可通过焊枪修补处理,如环向、纵向裂缝小于管周长的112或孔径60mm的情况。

钢波纹管

钢波纹管

当损坏程度大于这些数据时,宜通过换波纹管或基修建检查井、衔接井等修补办法处理。现以1-5m钢波纹管工程实例钢波纹管工程施工工艺操控简述如下。某高速公路因为工期较紧,考虑到原规划为1-2m石拱涵,而且其上有高达20m左右的涵顶填土。

When the damage degree is greater than these data, it should be repaired by replacing bellows or building inspection well and connecting well. Taking the 1-5m steel bellows project as an example, the construction technology of steel bellows project is described as follows. Due to the tight construction period of an expressway, considering that the original planning is 1-2m stone arch culvert, and there is about 20m of culvert top filling on it.

因为石拱涵施工进展较慢,为加速施工进展,业主部分要求将原规划石拱涵改变规划为1-5m钢波纹管工程涵,以确保施工质量,加速工程建设进展。波纹管涵为直径5m的组装波纹管,全长110m,填方高度达20余米。

钢波纹管

钢波纹管

钢波纹管是替换圆管涵、盖板涵、拱涵和小桥的公路建材,该产品具有工期短、重量轻、设备利便、耐久性好、工程造价低、抗变形才能较强、削减通车后维护本钱等利益,特别应用在高寒冻土区域,软土路基地带和深填土地带具有明显的经济效益。

雨期时节应留心防止管材漂浮、位移等现象,当管道设备结束没有覆土遇到水泡情况时,应复测管底与管中心高程,并做好返工处理办法。波纹管安顿和线盒及预留洞处相和谐,管线盒尽可能安顿在管间肋的位置。波纹管运工作面后,铺放前应检查管材的外形及管端的堵头封堵是否紧密,对变形或裂口处进行修补。http://www.hshaowei.com/

[返回]   
分享此文章:
在线咨询
全国统一服务咨询热线
13803180223
业务联系人:王华
电话:0318-7093363
传真:0318-7093373
地址:衡水经济开发区
  • 扫一扫获取
    钢波纹管产品报价

版权所有:衡水浩威新材料有限公司   ICP备案/许可证号:冀ICP备2024050732号-1   技术支持:衡水龙腾网络公司